Amazon cover image
Image from Amazon.com

Construction Project Scheduling and Control

By: Material type: TextTextPublication details: John Wiley & Sons 2019 USAEdition: 4th edDescription: 574pISBN:
  • 9781119499831
Subject(s): DDC classification:
  • 690.0685 MUB
Tags from this library: No tags from this library for this title. Log in to add tags.
Star ratings
    Average rating: 0.0 (0 votes)
Total holds: 0

Chapter: 1 Introduction
Chapter: 2 Bar(Gantt) Charts
Chapter: 3 Basic Networks
Chapter: 4 The Critical Path Method (CPM)
Chapter: 5 Precedence Networks
Chapter: 6 Resource Allocation and Resource Leveling
Chapter: 7 Schedule Updating and Project Control
Chapter: 8 Schedule Compression and Time Cost Trade Off
Chapter: 9 Reports and Presentations
Chapter: 10 Scheduling as Part of the Project Management Effort
Chapter: 11 Other Scheduling Methods
Chapter: 12 Dynamic Minimum Lag Relationship
Chapter: 13 The Critical Path Definition: Revisited
Chapter: 14 Construction Delays and other Claims
Chapter: 15 Schedule Risk Management
Chapter: 16 BIM Based 4D Modeling Scheduling
Chapter: 17 Project Scheduling for Owners
Appendix: A Computer Project
Appendix: B Sample Reports

There are no comments on this title.

to post a comment.
© 2025 by NIMA Knowledge Centre, Ahmedabad.
Koha version 24.05