Guidelines for Rehabilitation and Modernization of Irrigation Projects

By: Material type: TextTextPublication details: New Delhi International Commission on Irrigation and Drainage 1999Description: 42pSubject(s): DDC classification:
  • 627.52 PRI
Tags from this library: No tags from this library for this title. Log in to add tags.
Star ratings
    Average rating: 0.0 (0 votes)
Holdings
Item type Current library Item location Collection Call number Status Date due Barcode Item holds
Reference Book Reference Book NIMA Knowledge Centre 6th Floor Silence Zone Reference 627.52 PRI (Browse shelf(Opens below)) Not For Loan T0030661
Total holds: 0

Introduction and Overview Review of Original Project Objectives and Conditions Project Management Project Definition and Original Objectives Diagnostic Analysis of the Existing System Performance of Existing Facilities Adequacy of the Water Resources Operation, Maintenance and Management Institutional Aspects Identification of Future Objectives Establishing Short Term and Long Term Future Objectives Future Land Use and Related Water Impacts Future Operation and Maintenance Considerations Formulation of a Rehabilitation or Modernization Project Identification and Formulation of Alternatives Evaluation of Alternatives and Project Selection Financing, Implementation and Improving Management Financing Institutional Considerations Design and Construction Monitoring Operation, Maintenance and Management of the Completed Rehabilitated and Modernization Projects Appendix - A: Typical Activity Schedule for Irrigation and Drainage Rehabilitation and Modernization Projects Appendix - B: References List of Boxes

There are no comments on this title.

to post a comment.
© 2025 by NIMA Knowledge Centre, Ahmedabad.
Koha version 24.05