Distillation Troubleshooting
Kister, Henry Z.
Distillation Troubleshooting - New Jersey John Wiley & Sons Inc. 2006 - 713p
Troubleshooting Distillation Simulations Where Fractionation Goes Wrong Energy Savings and Thermal Effects Tower Sizing and Material Selection Affect Performance Feed Entry Pitfalls in Tray Towers Packed Tower Liquid Distributors: Number 6 on the Top 10 Malfunctions Vapor Maldistribution in Trays and Packings Tower Base Level and Reboiler Return: Number 2 on the Top 10 Malfunctions Chimney Try Malfunctions: Part of Number 7 on the Top 10 Malfunctions Draw off Malfunctions (Non Chimney Tray) Part of Number 7 on the Top 10 Malfunctions Tower Assembly Mishaps: Number 5 on the Top 10 Malfunctions Difficulties during Start up Shutdown, Commissioning, and Abnormal Operation: Number 4 on the Top 10 Malfunctions Water Induced Pressure Surges: Part of Number 3 on the Top 10 Malfunctions Explosions, Fires and Chemical Releases: Number 10 on the Top 10 Malfunctions Undesired Reactions in Towers Foaming The Tower as a Filter: Part A Causes of Plugging - Number 1 on the Top 10 Malfunctions Coking: Number 1 on the Top 10 Malfunctions Leaks Relief and Failure Tray, Packing and Tower Damage: Part of Number 3 on the Top 10 Malfunctions Reboilers That Did Not Work: Number 9 on the Top 10 Malfunctions Condensers That Did Not work Misleading Measurements: Number 8 on the Top 10 Malfunctions Control System Assembly Difficulties Where Do Temperature and composition Controls Go Wrong? Misbehaved Pressure, Condenser, Reboiler and Preheater Controls Miscellaneous Control Problems
9780471467441 0.00
Chemical Engineering
660.28425 / KIS
Distillation Troubleshooting - New Jersey John Wiley & Sons Inc. 2006 - 713p
Troubleshooting Distillation Simulations Where Fractionation Goes Wrong Energy Savings and Thermal Effects Tower Sizing and Material Selection Affect Performance Feed Entry Pitfalls in Tray Towers Packed Tower Liquid Distributors: Number 6 on the Top 10 Malfunctions Vapor Maldistribution in Trays and Packings Tower Base Level and Reboiler Return: Number 2 on the Top 10 Malfunctions Chimney Try Malfunctions: Part of Number 7 on the Top 10 Malfunctions Draw off Malfunctions (Non Chimney Tray) Part of Number 7 on the Top 10 Malfunctions Tower Assembly Mishaps: Number 5 on the Top 10 Malfunctions Difficulties during Start up Shutdown, Commissioning, and Abnormal Operation: Number 4 on the Top 10 Malfunctions Water Induced Pressure Surges: Part of Number 3 on the Top 10 Malfunctions Explosions, Fires and Chemical Releases: Number 10 on the Top 10 Malfunctions Undesired Reactions in Towers Foaming The Tower as a Filter: Part A Causes of Plugging - Number 1 on the Top 10 Malfunctions Coking: Number 1 on the Top 10 Malfunctions Leaks Relief and Failure Tray, Packing and Tower Damage: Part of Number 3 on the Top 10 Malfunctions Reboilers That Did Not Work: Number 9 on the Top 10 Malfunctions Condensers That Did Not work Misleading Measurements: Number 8 on the Top 10 Malfunctions Control System Assembly Difficulties Where Do Temperature and composition Controls Go Wrong? Misbehaved Pressure, Condenser, Reboiler and Preheater Controls Miscellaneous Control Problems
9780471467441 0.00
Chemical Engineering
660.28425 / KIS