International Seminar on Steel and Composite Bridges: Conference Documentation Vol - 3
Bhide, M. C.
International Seminar on Steel and Composite Bridges: Conference Documentation Vol - 3 - Mumbai Indian Institute of Bridge Engineers 2002 - 146p
Part - A: Design, Construction and Planning of Steel Bridges Assessment of Fatigue Life of Steel Girder Bridges using S N Curve Approach Case Studies and Planning Aspects of Steel Lattice Girder Bridges of Spans 31 - 90 Meters Constructed in the Last 10 Years The Construction and Completion of Bridge B8 in Federal Territories, Malaysia Ghazi Barotha Hydropower Project Structural Steel Riveted Railway Bridge Associated with Composite Pedestrian Walkway Construction of Flyovers and Interchanges Let Us Evaluate the Full Potential of the Steel Structure Alternative before making the Decision Part - B: Design and Construction of Steel Composite Bridges Deformation Requirements in Steel and Composite Bridges Part - C: Special Bridge Structures Bridging Kashmir Underground Way Tunnelling on Udhampur Katra Section Largest Speceframe Roof for Two Boeing 747 - 400 Aircraft for Air India at Mumbai Medium Span Bridges and Steel Network Arch Broad Gauge Railway Bridge Across River Saryu at Ayodhya Part - D: Miscellaneous Corrosion and Protective Measures for Steel Bridges
0.00
Civil Engineering
624.2 / STE
International Seminar on Steel and Composite Bridges: Conference Documentation Vol - 3 - Mumbai Indian Institute of Bridge Engineers 2002 - 146p
Part - A: Design, Construction and Planning of Steel Bridges Assessment of Fatigue Life of Steel Girder Bridges using S N Curve Approach Case Studies and Planning Aspects of Steel Lattice Girder Bridges of Spans 31 - 90 Meters Constructed in the Last 10 Years The Construction and Completion of Bridge B8 in Federal Territories, Malaysia Ghazi Barotha Hydropower Project Structural Steel Riveted Railway Bridge Associated with Composite Pedestrian Walkway Construction of Flyovers and Interchanges Let Us Evaluate the Full Potential of the Steel Structure Alternative before making the Decision Part - B: Design and Construction of Steel Composite Bridges Deformation Requirements in Steel and Composite Bridges Part - C: Special Bridge Structures Bridging Kashmir Underground Way Tunnelling on Udhampur Katra Section Largest Speceframe Roof for Two Boeing 747 - 400 Aircraft for Air India at Mumbai Medium Span Bridges and Steel Network Arch Broad Gauge Railway Bridge Across River Saryu at Ayodhya Part - D: Miscellaneous Corrosion and Protective Measures for Steel Bridges
0.00
Civil Engineering
624.2 / STE