Design and Construction of Bridges in India Vol - 1

Material type: TextTextSeries: Civil Engineering and Construction ReviewPublication details: New Delhi Civil Engineering and Construction Review 1999Description: 162pSubject(s): DDC classification:
  • 624.2 DES
Tags from this library: No tags from this library for this title. Log in to add tags.
Star ratings
    Average rating: 0.0 (0 votes)
Holdings
Item type Current library Item location Collection Call number Status Date due Barcode Item holds
Reference Book Reference Book NIMA Knowledge Centre 6th Floor Silence Zone Reference 624.2 DES (Browse shelf(Opens below)) Not For Loan T0027681
Total holds: 0

July 1993: Bridges Special Developments in Design and Construction of Concrete Bridges Technological Developments in Bridge Construction by Indian Railways Changing Trends in Bridge Design and Construction Bridge Bearings: Problems and Solutions Bridge Bearings: Material Technology and Its Quality Control Repair of a Road Bridge - A Case Study Second Hoogly River Bridge June 1995: Bridges Special Innovations in Composite Bridge Structures Why Continuous Bridges? Railway Bridge over Kali Nadi A Simplified Approach for computation of I.L.D. of truss Bridges Rehabilitation of Bridges Caisson Launching - A Case Study Well Sinking: Problems and Remedies October 1996: Bridges Special Seminar Recommendations: Planning and Management of Bridges Third Godavari Railway Bridge at Rajamundry: Some Design and Construction Aspects Permanent Suspension Bridges - Emerging Indian Scenario Analysis and Design of Varanasi Bridge - Some Innovative Aspects Launching of Bridge Girders: A Case Study Prestressed Concrete Bridge Construction Through Prefab Technology New Products Articles from other Issues New Deck for Mirthal Bridge - September 1988 Hardware Cable Stayed Bridge - November 1988 The Pamban Road - Bridge - November 1988 Design of Single Lane Bridges - September 1990 Increasing Awareness of Constructability, Serviceability and Durability In Bridge Design - September 1990 Resetting Roller Bearing of Suspended Span - November 1990 Fatigue Design for the Revision of IRC Steel Bridge Code - October 1991 Steel Roadway Decking in Place of Timber for Steel Equipment Bridges - March 1992 Construction Features of Thane Creek Railway Bridge - December 1993 Permeability of PSC Girders in Bridges - A Subtle Problem - November 1996 March 1998: Bridges Special Jackdown Method of Well Sinking for New Nizamuddin Bridge in New Delhi Design and Construction of A Bridge Over River Teesta Dodan Nallah Arch Bridge Replacement of Expansion Joint of Rabindra Setu (Howrah Bridge) Design of Composite Bridge Decks: A New Method with a New Material Application of the Expert System Software for Structural Optimization of Truss-Girder Bridges

There are no comments on this title.

to post a comment.
© 2025 by NIMA Knowledge Centre, Ahmedabad.
Koha version 24.05