International Seminar on Quality Management of Concrete Construction 12-14 September, 1997 Nagpur, India

Material type: TextTextPublication details: Chennai Indian Concrete Institute 1997Description: 194pSubject(s): DDC classification:
  • 693.5 QUA
Tags from this library: No tags from this library for this title. Log in to add tags.
Star ratings
    Average rating: 0.0 (0 votes)

Quality Control and ISO 9000 in Construction Practices Developing a Quality System for Construction Industry as Per ISO 9000 Standards Quality Assurance Manual an Important Tool for Field Engineer Quality Assurance and Quality Control in Reinforced Concrete Works Keynote Address: Resource Management Quality Management of Concrete in Pavement Construction Quality Assurance for Magnesium Oxychloride Cement Concrete Welded Wire Fabric as Structural Reinforcement Quality Management of Concrete Construction for a Thermal Power Plant in Deserts of Rajasthan Key Note Address: Buildability/Constructability of Concrete Construction Processes Developing a Construction System Construction of a Foreshaft in Weak Ground Problems and Solutions Quality Management of Concrete Revetment by Prefabrication Critical Review of various Parameters Helpful in Achieving Effective Gunite in Concrete Construction Slipforming of Tall Piers Keynote address: Quality Management of Construction: HRD Training and Safety Training Quality Policy Achieving Constructed Facility Quality: Integration is Key Surgery of' Total Quality Management through Yoga Keynote Address: Requirements of ISO 9000 Critical Study of ISO 9000 Guidelines and their Implementation in Construction Industry Indian Scenario ISO 9000 in Civil Design Implementation of TQM In Construction: Some Propositions for Top Management Quality in The Construction Project A Guideline for Owners: Designers And Contractors Need for Quality Management in Concrete Construction and Its Durability Assurance by Utilizing Admixtures Quality Control in Concrete Construction: Contract Documents Total Quality Planning Planning. A Clock Graph Approach Construction Site Management A Key for Quality Concrete Constructions Total Quality Management in Construction An Overview Mass Concrete Placement for The Twin Components of Idikki Hydel Project A Case Study

There are no comments on this title.

to post a comment.
© 2025 by NIMA Knowledge Centre, Ahmedabad.
Koha version 24.05