International Seminar on Steel and Composite Bridges: Conference Documentation Vol - 1

By: Material type: TextTextPublication details: Mumbai Indian Institute of Bridge Engineers 2002Description: 312pSubject(s): DDC classification:
  • 624.2 STE
Tags from this library: No tags from this library for this title. Log in to add tags.
Star ratings
    Average rating: 0.0 (0 votes)

Part - A: Design, Construction and Planning o Steel Bridges Erection o the Approach Bridges at the Uddevalla Bridge Fabrication of Welded Griders Design and Construction of Bridges for Himalayan Foot Hills with Special Reference to Goke Bridge Reyond Khud Bridge: An Unique Bridge of the Indian Railways Role of Railway Engineers in Bridge Construction of the other Departments Economics of Steel Bridges V/S Concrete Bridges Bridge No. 20 Design and Launching Aspects Fabrication of 122.32cm Length open Web Welded Girders for Konkan Railways Slab Participation in Composite Section due to Normal Forces L and T's Malaysian Experience of Steel Bridges Part - B: Rehabilitation, Retrofit and Regirdering Regirdering of 6*25.6 M Span Semi through Early Steel Girders by Welded Plate Girders of Seena Bridge on Solapur Division of Central Railway Rehabilitation of Steel Bridges Issues Relevant to Design Rehabilitation of Steel Bridges and Case Studies Rehabilitation of Composite Bridge on Mumbai Agra National Highway Replacement Steel Bridges Preparing Manhattan Bridge for the Next Century Prolonging the Serviceability of the Deteriorated Parts of the Williamsburg Bridge during Reconstruction Replacement of Girders with Prestressed Concrete Slabs at Bridge No 716 up (128 × 6.10m) at km 748/17 - 21 between Thadi and Anakapalle Stations on Vijaywada Visakhapatnam Section Regirdering of Bridge No.279 down (16 × 12.19m) across the River Pumbaleru between Guduru and Manubolu Station on Gudur Vijayawada Section Modification of Ghatprabha Bridge (45 × 12.20m) for Gauge Conversion Modification of Bridge No. 184(14 × 45.70 m Span) across River Krishna Replacement of Ten Girders of 18.3m Span in Single Block of 6Hrs (Bridge No. 699 Up) using Hydraulic Road Cranes between Mehmedabad and Kanji Stations of Vadodara Ahmedabad Section of Western Railway on 25-04-2001

There are no comments on this title.

to post a comment.
© 2025 by NIMA Knowledge Centre, Ahmedabad.
Koha version 24.05