Local cover image
Local cover image
Amazon cover image
Image from Amazon.com

Scheduling Construction Projects

By: Material type: TextTextPublication details: John Wiley and Sons, Inc. Canada 1986Description: 462pISBN:
  • 0471808695
Subject(s): DDC classification:
  • 624.068 WIL
Tags from this library: No tags from this library for this title. Log in to add tags.
Star ratings
    Average rating: 0.0 (0 votes)
Holdings
Item type Current library Item location Collection Call number Status Date due Barcode Item holds
Reference Book Reference Book NIMA Knowledge Centre 6th Floor Silence Zone Reference 624.068 WIL (Browse shelf(Opens below)) Not For Loan T0052108
Total holds: 0

Contents
Chapter: 1 Introduction to Scheduling
Chapter: 2 Task Definition: The Foundation of a Schedule
Chapter: 3 Gantt Charts
Chapter: 4 Logic Diagram and Scheduling
Chapter: 5 The Critical Path Method (CPM)
Chapter: 6 Calculation of CPM Event and Task Times
Chapter: 7 The Precedence Method (PM)
Chapter: 8 Calculation of Precedence Method Task Times and Floats
Chapter: 9 Program Evaluation Review Technique (PERT)
Chapter: 10 Probabilistic Scheduling (Monte Carlo Method)
Chapter: 11 Calendar Day Scheduling
Chapter: 12 Updating the Schedule
Chapter: 13 Expediting the Project
Chapter: 14 Resource Constrained Scheduling and Re-Source Leveling
Chapter: 15 Cash Flow Analysis Based on Construction Schedules
Chapter: 16 Applications of Computers to Scheduling
Appendix A: The Scientific Cost Estimating Method
Appendix B: Computer Programs for Scheduling
Appendix C: Table of Random Numbers

There are no comments on this title.

to post a comment.

Click on an image to view it in the image viewer

Local cover image
© 2025 by NIMA Knowledge Centre, Ahmedabad.
Koha version 24.05