Scheduling Construction Projects
Material type:
- 0471808695
- 624.068 WIL
Item type | Current library | Item location | Collection | Call number | Status | Date due | Barcode | Item holds | |
---|---|---|---|---|---|---|---|---|---|
![]() |
NIMA Knowledge Centre | 6th Floor Silence Zone | Reference | 624.068 WIL (Browse shelf(Opens below)) | Not For Loan | T0052108 |
Contents
Chapter: 1 Introduction to Scheduling
Chapter: 2 Task Definition: The Foundation of a Schedule
Chapter: 3 Gantt Charts
Chapter: 4 Logic Diagram and Scheduling
Chapter: 5 The Critical Path Method (CPM)
Chapter: 6 Calculation of CPM Event and Task Times
Chapter: 7 The Precedence Method (PM)
Chapter: 8 Calculation of Precedence Method Task Times and Floats
Chapter: 9 Program Evaluation Review Technique (PERT)
Chapter: 10 Probabilistic Scheduling (Monte Carlo Method)
Chapter: 11 Calendar Day Scheduling
Chapter: 12 Updating the Schedule
Chapter: 13 Expediting the Project
Chapter: 14 Resource Constrained Scheduling and Re-Source Leveling
Chapter: 15 Cash Flow Analysis Based on Construction Schedules
Chapter: 16 Applications of Computers to Scheduling
Appendix A: The Scientific Cost Estimating Method
Appendix B: Computer Programs for Scheduling
Appendix C: Table of Random Numbers
There are no comments on this title.