Amazon cover image
Image from Amazon.com

Construction Project Scheduling and Control

By: Material type: TextTextPublication details: John Wiley & Sons 2019 USAEdition: 4th edDescription: 574pISBN:
  • 9781119499831
Subject(s): DDC classification:
  • 690.0685 MUB
Tags from this library: No tags from this library for this title. Log in to add tags.
Star ratings
    Average rating: 0.0 (0 votes)
Holdings
Item type Current library Item location Collection Call number Status Date due Barcode Item holds
Reference Book Reference Book NIMA Knowledge Centre 6th Floor Silence Zone Reference 690.0685 MUB (Browse shelf(Opens below)) Not For Loan T0052608
Total holds: 0

Chapter: 1 Introduction
Chapter: 2 Bar(Gantt) Charts
Chapter: 3 Basic Networks
Chapter: 4 The Critical Path Method (CPM)
Chapter: 5 Precedence Networks
Chapter: 6 Resource Allocation and Resource Leveling
Chapter: 7 Schedule Updating and Project Control
Chapter: 8 Schedule Compression and Time Cost Trade Off
Chapter: 9 Reports and Presentations
Chapter: 10 Scheduling as Part of the Project Management Effort
Chapter: 11 Other Scheduling Methods
Chapter: 12 Dynamic Minimum Lag Relationship
Chapter: 13 The Critical Path Definition: Revisited
Chapter: 14 Construction Delays and other Claims
Chapter: 15 Schedule Risk Management
Chapter: 16 BIM Based 4D Modeling Scheduling
Chapter: 17 Project Scheduling for Owners
Appendix: A Computer Project
Appendix: B Sample Reports

There are no comments on this title.

to post a comment.
© 2025 by NIMA Knowledge Centre, Ahmedabad.
Koha version 24.05