Construction Project Scheduling and Control
Material type:
- 9781119499831
- 690.0685 MUB
Item type | Current library | Item location | Collection | Call number | Status | Date due | Barcode | Item holds | |
---|---|---|---|---|---|---|---|---|---|
![]() |
NIMA Knowledge Centre | 6th Floor Silence Zone | Reference | 690.0685 MUB (Browse shelf(Opens below)) | Not For Loan | T0052608 |
Chapter: 1 Introduction
Chapter: 2 Bar(Gantt) Charts
Chapter: 3 Basic Networks
Chapter: 4 The Critical Path Method (CPM)
Chapter: 5 Precedence Networks
Chapter: 6 Resource Allocation and Resource Leveling
Chapter: 7 Schedule Updating and Project Control
Chapter: 8 Schedule Compression and Time Cost Trade Off
Chapter: 9 Reports and Presentations
Chapter: 10 Scheduling as Part of the Project Management Effort
Chapter: 11 Other Scheduling Methods
Chapter: 12 Dynamic Minimum Lag Relationship
Chapter: 13 The Critical Path Definition: Revisited
Chapter: 14 Construction Delays and other Claims
Chapter: 15 Schedule Risk Management
Chapter: 16 BIM Based 4D Modeling Scheduling
Chapter: 17 Project Scheduling for Owners
Appendix: A Computer Project
Appendix: B Sample Reports
There are no comments on this title.