000 | nam a22 4500 | ||
---|---|---|---|
999 |
_c120496 _d120496 |
||
003 | OSt | ||
005 | 20210730131924.0 | ||
008 | 200629b ||||| |||| 00| 0 eng d | ||
020 | _a9780367247096 | ||
040 | _c | ||
082 |
_a658.4013 _bSPR |
||
100 |
_aSproull, Bob _943395 |
||
245 | _aTheory of Constraints, Lean and Six Sigma Improvement Methodology: Making the Case for Integration | ||
260 |
_bRoutledge _c2019 _aLondon |
||
300 | _a288p | ||
500 | _a1: What is This Thing Called the Theory of Constraints? 2: What is This Thing Called Lean Manufacturing. 3: What is This Thing Called Six Sigma. 4: How to Integrate Lean, Six Sigma, and the Theory of Constraints. 5: Better Way to Measure a System's Success. 6: TOC's Distribution and Replenish Model. 7: A Case Study on the Theory of Constraints. 8: A Case Study on Helicopter Maintenance, Repair & Overhaul. 9: Healthcare Case Study. 10: Case Study on a Medical Device Manufacturer. 11: Case Study on Engine Overhaul. 12: A Case Study on Project Management. 13: Mafia Offers and Viable Vision | ||
600 |
_aSix Sigma (Quality Control Standard) - Lean Manufacturing _949119 |
||
942 |
_2ddc _cLB _k658.4013 _mSPR |