000 | 01741nam a2200169Ia 4500 | ||
---|---|---|---|
008 | 140223b2002 xxu||||| |||| 00| 0 eng d | ||
020 | _c0.00 | ||
082 |
_a624.2 _bSTE |
||
100 | _aBhide, M. C. | ||
245 | _aInternational Seminar on Steel and Composite Bridges: Conference Documentation Vol - 3 | ||
260 |
_aMumbai _bIndian Institute of Bridge Engineers _c2002 |
||
300 | _a146p | ||
500 | _aPart - A: Design, Construction and Planning of Steel Bridges Assessment of Fatigue Life of Steel Girder Bridges using S N Curve Approach Case Studies and Planning Aspects of Steel Lattice Girder Bridges of Spans 31 - 90 Meters Constructed in the Last 10 Years The Construction and Completion of Bridge B8 in Federal Territories, Malaysia Ghazi Barotha Hydropower Project Structural Steel Riveted Railway Bridge Associated with Composite Pedestrian Walkway Construction of Flyovers and Interchanges Let Us Evaluate the Full Potential of the Steel Structure Alternative before making the Decision Part - B: Design and Construction of Steel Composite Bridges Deformation Requirements in Steel and Composite Bridges Part - C: Special Bridge Structures Bridging Kashmir Underground Way Tunnelling on Udhampur Katra Section Largest Speceframe Roof for Two Boeing 747 - 400 Aircraft for Air India at Mumbai Medium Span Bridges and Steel Network Arch Broad Gauge Railway Bridge Across River Saryu at Ayodhya Part - D: Miscellaneous Corrosion and Protective Measures for Steel Bridges | ||
600 | _aCivil Engineering | ||
890 | _aIndia | ||
995 |
_ASTE _CCIT-NIT _D267.00 _E0 _F049 _H0 _I0.00 _JSET PRICE 800.00 VOL 1 - 3 _UC _W20030719 _XIndian Institute of Bridge Engineers; Mumbai _ZReference |
||
999 |
_c46943 _d46943 |