000 01741nam a2200169Ia 4500
008 140223b2002 xxu||||| |||| 00| 0 eng d
020 _c0.00
082 _a624.2
_bSTE
100 _aBhide, M. C.
245 _aInternational Seminar on Steel and Composite Bridges: Conference Documentation Vol - 3
260 _aMumbai
_bIndian Institute of Bridge Engineers
_c2002
300 _a146p
500 _aPart - A: Design, Construction and Planning of Steel Bridges Assessment of Fatigue Life of Steel Girder Bridges using S N Curve Approach Case Studies and Planning Aspects of Steel Lattice Girder Bridges of Spans 31 - 90 Meters Constructed in the Last 10 Years The Construction and Completion of Bridge B8 in Federal Territories, Malaysia Ghazi Barotha Hydropower Project Structural Steel Riveted Railway Bridge Associated with Composite Pedestrian Walkway Construction of Flyovers and Interchanges Let Us Evaluate the Full Potential of the Steel Structure Alternative before making the Decision Part - B: Design and Construction of Steel Composite Bridges Deformation Requirements in Steel and Composite Bridges Part - C: Special Bridge Structures Bridging Kashmir Underground Way Tunnelling on Udhampur Katra Section Largest Speceframe Roof for Two Boeing 747 - 400 Aircraft for Air India at Mumbai Medium Span Bridges and Steel Network Arch Broad Gauge Railway Bridge Across River Saryu at Ayodhya Part - D: Miscellaneous Corrosion and Protective Measures for Steel Bridges
600 _aCivil Engineering
890 _aIndia
995 _ASTE
_CCIT-NIT
_D267.00
_E0
_F049
_H0
_I0.00
_JSET PRICE 800.00 VOL 1 - 3
_UC
_W20030719
_XIndian Institute of Bridge Engineers; Mumbai
_ZReference
999 _c46943
_d46943