000 | 01008nam a2200157Ia 4500 | ||
---|---|---|---|
008 | 140223b2002 xxu||||| |||| 00| 0 eng d | ||
020 | _c0.00 | ||
082 |
_a624.3 _bLIF |
||
245 | _aLife Cycle Cost Assessment of Typical Urban Flyover | ||
260 |
_aCalcutta _bInstitute for Steel Development and Growth _c2002 |
||
300 | _a140p | ||
500 | _aIntroduction, Approach and Methodology Concepts of Life Cycle Cost LCC Related Codes and Standards The Current Study Design Approach and Design Process Estimation of Initial Cost Estimation of Construction Time Interest, Inflation and Discount Rates Assessment of Time Cost Life Cycle Cost Heads Road User Cost Routine Inspection and Periodic Maintenance Cost Major Repair Cost and End Use Value Life Cycle cost Summary Tables | ||
600 | _aCivil Engineering | ||
890 | _aIndia | ||
995 |
_ALIF _CCIT-NIT _D0.00 _E0 _F049 _H0 _I0.00 _UC _W20030202 _XInstitute for Steel Development and Growth (INSDAG) _ZReference |
||
999 |
_c47198 _d47198 |