000 01756nam a2200157Ia 4500
008 140223b1999 xxu||||| |||| 00| 0 eng d
020 _c0.00
082 _a624.193
_bTUN
245 _aTunnels and Tunnelling
260 _aNew Delhi
_bCivil Engineering and Construction Review
_c1999
300 _a100p
500 _aSeptember 1992: Tunnels and Tunnelling Progress Pattern of Tunnelling with Respect to Tunnelling Methodologies in India (A Comparative Study) Underground Construction in Developing Countries Why Metros Derail Investigation Methods for Tunnelling Projects Box Jacking Technique Cemindia Widens Delhi Road Underbridge Instrumentation for Tunnelling Projects Directory of Manufacturers July 1994: Tunnelling Special Tunnelling in Soft Ground for the Delhi Metron Design and Construction Aspects of Uri Hydroelectric Project (Underground Works) Tunnelling Through Lake Deposits: An Experience Tunnel Waterproofing: A Protective Underground Umbrella Tunnel Supporting Techniques Microtunnelling into the Future Tunnelling Equipment: Drilling Jumbos and Hydraulic Hammers January 1998: Tunnelling and Underground Construction Concrete Lining of Diversion Tunnels at Ranjit Sagar Dam Project Tunnelling at NAthpa Jhakri Hydel Project Use of Precast Concrete Tunnel Lining Segments in Soft Strata: A Case Study Junctions in Underground Works: A Case Study on Construction Methods and Selection of Supports in Geologically Weaker Formations Rock Support System for Underground Works Articles from Other Issues Chamera Hydroelectric Project
600 _aCivil Engineering
890 _aIndia
995 _ATUN
_D180.00
_E0
_F049
_G25077
_H0
_I0.00
_UC
_W20010628
_XTrend-set Engineering Pvt. Ltd.
_ZReference
999 _c49153
_d49153